Energy monitoring

Steyr municipal utilities

Integration of critical areas into a holistic system The solution offers precise switching and control of machines and charging infrastructure during blackouts, improves security of supply and reduces the impact of blackouts. Holistic energy management includes load and charging management, billing and energy accounting. Improving security of supply and energy management Grid-supportive energy management allows electric vehicles to be charged at current spot market tariffs, which [...]

Steyr municipal utilities Read More "

Zwölferhorn cable car

Energy self-sufficient Zwölferhorn cable car in St. Gilgen With the implementation of an 804 kWp photovoltaic system and a 550 kWh battery storage system, the Zwölferhorn cable car in St. Gilgen has become the first almost energy self-sufficient cable car in the world. During the peak season, the installation runs entirely on solar power, and on average over the year, it even generates an energy surplus that can be fed into the local grid. The project is a

Zwölferhorn cable car Read More "